BS EN 14587-2:2009
Discover how BS EN 14587-2:2009 enhances compliance and safety in railway track welding with mobile machines. Practical guidance for effective implementation.
Overview
BS EN 14587-2:2009 is a crucial standard that outlines the requirements for the flash butt welding of railway tracks. Specifically, it addresses the welding of new R220, R260, R260Mn, and R350HT grade rails using mobile welding machines at locations other than fixed plants. This standard is essential for ensuring the integrity and safety of railway infrastructure by providing guidelines for effective welding practices.
Key Requirements
The standard specifies several key requirements that must be adhered to during the welding process:
- Welding Equipment: The mobile welding machines must meet specific technical criteria to ensure reliable operation and consistent weld quality.
- Welding Procedure: A detailed welding procedure must be established and documented, including parameters such as heat input, welding speed, and cooling rates.
- Quality Control: Regular inspections and tests must be conducted to verify the quality of the welds, including non-destructive testing methods.
- Personnel Qualification: Operators and technicians involved in the welding process must possess the necessary qualifications and training to perform their tasks competently.
Implementation Benefits
Implementing BS EN 14587-2:2009 provides several benefits for railway operators and contractors:
- Enhanced Safety: By following the standard, organisations can significantly reduce the risk of weld failures, which can lead to accidents and service disruptions.
- Improved Reliability: Adhering to the specified welding procedures ensures that the welds are strong and durable, contributing to the overall reliability of the railway system.
- Operational Efficiency: Mobile welding machines allow for on-site repairs and installations, reducing downtime and improving operational efficiency.
- Cost-Effectiveness: By minimising the need for extensive repairs and replacements due to poor weld quality, organisations can achieve significant cost savings over time.
Compliance Value
Compliance with BS EN 14587-2:2009 is not just a regulatory requirement; it also demonstrates a commitment to quality and safety in railway operations. By adhering to this standard, organisations can:
- Meet Regulatory Requirements: Compliance with national and international regulations governing railway safety and construction.
- Enhance Reputation: Establish a reputation for quality and reliability, which can lead to increased customer trust and business opportunities.
- Facilitate Audits: Simplify the auditing process by maintaining documented evidence of compliance with established welding procedures and quality control measures.
In conclusion, BS EN 14587-2:2009 is an essential standard for the flash butt welding of railway tracks. Its implementation not only ensures compliance with safety regulations but also enhances the overall quality and reliability of railway infrastructure.
Technical Information
Specification Details
- Railway applications
- Track
- Flash butt welding of rails - New R220, R260, R260Mn and R350HT grade rails by mobile welding machines at sites other than a fixed plant