Ensure compliance and efficiency in land reclamation projects with BS EN 16907-6:2018, focusing on dredged hydraulic fill earthworks.

Overview

BS EN 16907-6:2018 provides essential guidelines for earthworks related to land reclamation using dredged hydraulic fill. This standard is crucial for civil engineering projects that involve the use of hydraulic fill materials, ensuring that the processes are efficient, safe, and environmentally responsible. The standard outlines the requirements for the design, execution, and monitoring of earthworks, which are vital for the successful reclamation of land.

Key Requirements

The standard specifies a range of requirements that must be adhered to during the execution of land reclamation projects. Key requirements include:

  • Material Specifications: Guidelines on the types of hydraulic fill materials that can be used, including their physical and chemical properties.
  • Design Principles: Recommendations for the design of earthworks to ensure stability and durability, taking into account factors such as soil characteristics and environmental conditions.
  • Construction Practices: Best practices for the construction process, including methods for placing and compacting hydraulic fill to achieve optimal performance.
  • Quality Control: Procedures for monitoring and testing the hydraulic fill materials and the completed earthworks to ensure compliance with the specified requirements.

Implementation Benefits

Adopting BS EN 16907-6:2018 in civil engineering projects offers numerous benefits:

  • Enhanced Project Efficiency: By following the guidelines, project teams can streamline processes, reducing delays and costs associated with rework.
  • Improved Safety: The standard promotes safe working practices, which help to mitigate risks associated with earthworks and hydraulic fill usage.
  • Environmental Protection: Compliance with the standard ensures that land reclamation activities are conducted with minimal impact on the surrounding environment.
  • Increased Stakeholder Confidence: Adhering to established standards enhances the credibility of the project, fostering trust among clients, regulatory bodies, and the public.

Compliance Value

Compliance with BS EN 16907-6:2018 is not only a legal requirement in many jurisdictions but also a best practice that enhances the overall quality of civil engineering projects. By ensuring that all aspects of land reclamation earthworks are conducted according to the standard, organisations can:

  • Meet Regulatory Requirements: Many local and national regulations reference this standard, making compliance essential for legal operation.
  • Reduce Liability: Following the standard can help mitigate risks associated with project failures or environmental damage, thus reducing potential liabilities.
  • Facilitate International Trade: For projects involving international stakeholders, compliance with European standards can ease trade barriers and enhance collaboration.

In conclusion, BS EN 16907-6:2018 serves as a comprehensive framework for the effective management of land reclamation projects using dredged hydraulic fill. Its implementation not only ensures compliance with legal and environmental standards but also promotes best practices in civil engineering.

Technical Information

Civil Engineering
BSI Group
978 0 580 91420 1
Specification Details
  • Earthworks - Land reclamation earthworks using dredged hydraulic fill
Official BSI Standard
Instant PDF Download
Industry Recognised

Purchase This Standard

Official Price
£306.00

Purchase the official standard directly from BSI Group. You'll be redirected to the official BSI website to complete your purchase.

Buy from BSI Group
Official BSI Standard
Instant PDF Download
Secure Payment